Rotary Club of Arusha Mount Meru

Signature project · Under construction

A region of two million people, and no blood bank.

Blood cannot be manufactured — it requires individuals to donate it. After collection it is sent to a blood bank, where it is processed, stored and distributed to hospitals. The Arusha Region has no blood bank; the nearest facility is about 100 km away in the Northern Zone. We are building the first one here, with Mt. Meru Regional Hospital and the Regional Commissioner's Office.

Project summary

Location
Arusha, Tanzania
Serves
2,000,000+Residents of the Arusha Region
Total cost
TZS 600M+USD 250,000+
Status
Plastering stage
Still required
TZS 342MItemised below
Site launched
May 2025By RI President-Elect Mário César Martins de Camargo

Why it matters

Distance is the whole problem.

A mother haemorrhaging after childbirth. A child with severe malarial anaemia. A casualty from the Arusha–Moshi road. In each case survival is measured in minutes, and in each case the blood that would save them is currently stored roughly 100 kilometres away.

A blood bank in Arusha changes three things at once: it collects locally, so donors in Arusha give in Arusha; it screens and stores locally, so units are ready before they are needed; and it issues locally, so a hospital's request is answered the same hour rather than the same day.

Who is behind it

A club project with public partners.

The blood bank is being built with Mt. Meru Regional Hospital and the Arusha Regional Commissioner's Office. That partnership is deliberate: the facility will sit inside the regional health system from the day it opens, with an owner, a staffing plan and a place in the referral chain.

In May 2025 the site was officially launched by Rotary International President-Elect Mário César Martins de Camargo, alongside the club and its partners.

Construction sequence

Where the building has reached.

Site & foundationComplete
WallsComplete
RoofingComplete
PlasteringIn progress
Windows & doorsOutstanding
Electrical & plumbingOutstanding
FinishingOutstanding
Perimeter fenceOutstanding

Outstanding works

TZS 342 million, itemised.

We publish the bill before we ask for the money. Every line below is a discrete package of work; a donor, a company or a partner club can fund one outright and see exactly what it paid for.

Remaining works — Tanzanian shillings
Work packageCost (TZS)
Doors
Internal, external and cold-room doors
147.7 M
Electrical installations
Wiring, distribution and standby power
73.7 M
Finishing
Screed, painting and fittings
45.6 M
Windows
Glazing and window frames throughout
36.8 M
Perimeter fence
Security fencing and gate
20.9 M
Plumbing & sanitation
Water reticulation, drainage and washrooms
17.3 M
Total outstanding342.0 M

Figures are the club's own construction estimates for the works remaining as at the plastering stage. Costs for completed stages — site, foundation, walls and roofing — are not included above.

Questions before you give

Talk to the project team.

Corporate donors, foundations, partner Rotary clubs and anyone considering a global grant contribution are welcome to ask for the drawings, the bill of quantities, the partnership agreements or a site visit. We would rather answer questions than assume trust.